Research Project
Your research project in CMGT210 supplements the structured learning that takes place in the
readings and class sessions. This project is your opportunity to expand your knowledge and skill as
a Project Manager and explore a question of interest within the field of construction management.
The research project is worth 15% of your final grade. The assignment is broken down into several
components. The general requirements for each element, as well as due dates and point values, are
noted below.
Research Topic Selection –
Review the provided list of research questions. Students will select
their topic. Only one student per topic will be allowed. The order of selection will be by lottery, so
students are encouraged to come to class prepared with backup preferences in the event another
student selects their first choice.
Research Report, Part 1
Locate outside articles or reports (minimum of two) related to the research question that you
selected. YOU CANNOT USE THE TEXTBOOK. Using your external research, formulate an answer to
the question. Your response to the question should include your perspective/opinion, but supported
with research. You are strongly encouraged to use the critical thinking framework discussed in
week 1 of class when drafting your report. The submitted report should be 2 to 3 pages, typed,
double-spaced. Copies of your research should be attached to your report, and your report must
include proper in-text citations and bibliography following APA format.
Research Report, Part 2
You will be asked a follow-up question related to your topic. Locate outside articles or reports (minimum of
two) related to the follow-up question that you receive. YOU CANNOT USE THE TEXTBOOK. Using
your external research, formulate an answer to the question. Your response to the question should
include your perspective/opinion, but supported with research. Include an explanation of how the
second part of your research reinforced or altered your perspective from Part 1. Again, you are
strongly encouraged to use the critical thinking framework discussed in week 1 of class when
drafting your report. The submitted report should be 3 to 4 pages, typed, double-spaced. Copies of
your research should be attached to your report, and your report must include proper in-text
citations and bibliography following APA format.
Research Report,
Each student will stand up and summarize the research questions that they
answered less in a 5- to 10-minute presentation, without reading your reports. I will determine the
order of presentations, so you must be prepared to present at any time during the class session.
Research Questions
1. What are the advantages to the construction team of using Building Information Modeling
(BIM)?
2. What is DBIA’s mission, and how do they educate the industry about the design-build delivery
method?
3. How does globalization impact the construction industry?
This is the first research question three pages
Part two research question is How does globalization impact material procurement 3 pages
So in total 6 pages
4. What is a Project Labor Agreement (PLA), and what are the reasons for using a PLA?
5. What is building commissioning, and what are the steps/procedures required?
6. What are the challenges for Contractors when changes are made to the design after
construction has started?
7. What is the current outlook for skilled labor in the construction industry? What is the industry
doing to address this outlook?
8. What are some business strategies that subcontractors use to succeed in bidding for work?
9. How do builders (contractors or subcontractors) establish, maintain, and improve their bonding
capacity?
10. What are ConsensusDocs, and what are some of the characteristics and benefits of
ConsensusDocs?
11. What are the main concepts in lean construction, and what are the advantages to contractors?
12. What procedures does a contractor put in place to achieve the safety goals for a project?
13. What methods or strategies to builders (contractors or subcontractors) use to improve jobsite
productivity?
14. What skills are essential for an estimator, and how does he/she achieve those skills?
15. What skills are essential for a quality control manager, and how does he/she achieve those
skills?
16. What are the advantages to a contractor when using the Critical Path Method (CPM) for
scheduling the project?
17. What does Net Zero mean, and how is this goal achieved?
18. Under what circumstances might a client/owner choose the Design-Build delivery method?
19. How does a contractor meet the quality standards established for the project?
20. What is Integrated Project Delivery (IPD), and what are the critical components of this delivery
method?
21. What is a PPP, and what are some requirements needed to make this delivery method
successful?
22. How are virtual reality (VR) and artificial intelligence (AI) being used by contractors to improve
jobsite performance?
Place your order now for a similar paper and have exceptional work written by our team of experts to guarantee you A Results
Why Choose US:
11+ years experience on custom writing
90% Return Client
Urgent 3 Hrs Delivery
Your Privacy Guaranteed
Unlimited Free Revisions
Money Back Guarantee
[ad_2]
Source link
"96% of our customers have reported a 90% and above score. You might want to place an order with us."