COUPLED TANKS GENERATION II RIG V1-1
CALIBRATION DATA
RELEASED 4TH AUGUST 2016
Partnered with… |
University of Technology, Sydney © 2016 |
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 1
Table of Contents
1 Overview………………………………………………………………………………………………………………………………….. 2
1.1 Variance Graphs …………………………………………………………………………………………………………………2
1.1.1 Level Sensors ……………………………………………………………………………………………………………….. 2
1.1.2 Control Valves……………………………………………………………………………………………………………….. 2
2 Calibration Data………………………………………………………………………………………………………………………… 3
2.1 All Rigs – Averaged Data – Updated 4th August 2016………………………………………………………………3
2.1.1 Level Sensors ……………………………………………………………………………………………………………….. 3
2.1.1 Control Valves……………………………………………………………………………………………………………….. 3
2.2 Rig 1 – Performed 4th August 2016 ……………………………………………………………………………………….4
2.2.1 Level Sensors ……………………………………………………………………………………………………………….. 4
2.2.2 Control Valves……………………………………………………………………………………………………………….. 4
2.3 Rig 2 – Performed 4th August 2016 ……………………………………………………………………………………….5
2.3.1 Level Sensors ……………………………………………………………………………………………………………….. 5
2.3.1 Control Valves……………………………………………………………………………………………………………….. 5
2.4 Rig 3 – Performed 4th August 2016 ……………………………………………………………………………………….6
2.4.1 Level Sensors ……………………………………………………………………………………………………………….. 6
2.4.2 Control Valves……………………………………………………………………………………………………………….. 6
2.5 Rig 4 – Performed 3rd August 2016 ……………………………………………………………………………………….7
2.5.1 Level Sensors ……………………………………………………………………………………………………………….. 7
2.5.2 Control Valves……………………………………………………………………………………………………………….. 7
2.6 Rig 5 – Performed 3rd August 2016 ……………………………………………………………………………………….8
2.6.1 Level Sensors ……………………………………………………………………………………………………………….. 8
2.6.2 Control Valves……………………………………………………………………………………………………………….. 8
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 2
1 Overview
Calibration data is provided for each Coupled Tanks Generation II v1-1 Rig. Each rig has slightly different
characteristics in terms of the deliverable flow rate via the control valve and additionally offsets and gradients
for the level sensors.
All efforts are made to keep the variance in calibration between rigs as close as possible. In future, all flow
meters in each rig will be calibrated from a reference source, thus reducing inter-rig variance further.
Please note that calibration data will be updated after maintenance is performed on each rig or any time a
faulty component is replaced. Standard maintenance intervals are every 12 months.
1.1 Variance Graphs
Provided for information only.
1.1.1 Level Sensors
1.1.2 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 3
2 Calibration Data
2.1 All Rigs – Averaged Data – Updated 4th August 2016
The data below averages all of the calibration data across each available Rig – providing the user with the
ability to calculate system dynamics and develop PID gains that can be applied across each Rig.
2.1.1 Level Sensors
2.1.1 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 4
2.2 Rig 1 – Performed 4th August 2016
2.2.1 Level Sensors
2.2.2 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 5
2.3 Rig 2 – Performed 4th August 2016
2.3.1 Level Sensors
2.3.1 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 6
2.4 Rig 3 – Performed 4th August 2016
2.4.1 Level Sensors
2.4.2 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 7
2.5 Rig 4 – Performed 3rd August 2016
2.5.1 Level Sensors
2.5.2 Control Valves
Coupled Tanks Generation II v1-1 Calibration Data
Released 4th August 2016
University of Technology, Sydney © 2016 Page 8
2.6 Rig 5 – Performed 3rd August 2016
2.6.1 Level Sensors
2.6.2 Control Valves
[Button id=”1″]