Mayor Jean Drapeau has given your group a fixed non-negotiable budget of $20 billion to build just the stadium at the same site (without the velodrome, village or the viaduct), and the stadium construction project must be completed within 2 years (i.e. August 2022). Project deliverables – Your project should produce an improved WBS, network diagram, Gantt chart, budget, risk register with its corresponding mitigating strategies. Make additional assumptions as needed, such as outsourcing, etc. as well as consideration for current events such as the pandemic. Since the project is already approved, no pre-selection calculations such as NPV, IRR, etc. are required. There is no narrative paper required for this project, however, a “narrative PowerPoint slide” should be submitted, which should include an audio presentation by all the team members. The PowerPoint slide should be submitted as a group to be graded. (I will do the recorded portion, just make sure I have the notes to read).
"96% of our customers have reported a 90% and above score. You might want to place an order with us."