progress results and finalizing the hr project 5
[ad_1]
Your HR project to develop a centralized model of delivering HR services has progressed through very critical stages of the project thus far. It is now time to present actionable, decision-making information to project leaders. This can be best accomplished when projects have been successfully managed, devoid of any major risks, and have been properly closed out and finalized.
Write a five to six (5-6) page paper in which you:
- Explain what it means to successfully direct and manage project work and identify and discuss 3-4 strategies you might use to manage and sustain progress in your HR project. Be specific.
- Identify and discuss a minimum of 3 strategies that could be used to address and resolve any risks within the control of the project. HINT: See Exhibit 14.5 in the textbook. (Attatched below) Is any one of the strategies you selected more important than the others? Why?
- Describe 2-3 actions a project manager may take as they begin to close out the project. Be sure to justify using the actions you discuss.
- Review Project Management in Action: The Power of Lessons Learned (pages 518-520 in the textbook which is attached below) and provide an overview to the project team on the significance of the information. Be specific.
- Go to http://research.strayer.edu to locate at least three (3) quality academic (peer-reviewed) resources in this assignment.
– Login info:Username SU200433316Password Humanr2020! (Exclamation included)
Your assignment must:
- Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
- Include a cover page containing the title of the assignment, the studentâ€s name, the professorâ€s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
*
[Button id=”1″]